From Downtime to Data: A Monitoring and Evaluation Framework Linking Cooling-Water Chemistry to Generator Availability at Bushrod Island Thermal Plant
Most cooling-water chemistry guidance was written for boiler-cycle plants. Reciprocating engine sets run on different circuits with different failure paths, and at the Bushrod Island Thermal Plant in Liberia, operated by the Liberia Electricity Corporation, those failure paths run straight to the availability numbers. Scale, corrosion and microbiological fouling in the jacket-cooling and closed cooling-water systems degrade heat transfer, force deratings and trigger outages, while the chemistry root causes go under-recorded and under-managed.
This session presents a Monitoring and Evaluation (M&E) framework that closes that gap in four parts: a root-cause classification that tags outages with a water-chemistry origin; a compact set of low-cost leading indicators (conductivity, pH, hardness, chloride, dissolved iron and copper, corrosion-coupon rates and microbiological activity); control limits, logging cadence and maintenance triggers that prompt action before a trip; and an evaluation layer built on KPIs including chemistry-attributable forced outage rate, mean time between failures, EFOR contribution and avoided generation loss.
The framework does two things at once. It adapts cooling-water chemistry control to engine cooling circuits rather than borrowing boiler-cycle assumptions, and it shows how measurement discipline turns reactive maintenance into predictive practice, in this case at a developing-country utility running heavy fuel oil and diesel engines as core generation. Anyone responsible for reciprocating engine availability, or trying to justify chemistry-monitoring spend with numbers a plant manager will accept, will find the model transferable.