Leaderboard

Loading
Optimizing Plant Performance
    • Optimizing Plant Performance
    W207A, Second Level -
    This session will discuss the application of Thermophase product at the 770 MW Longview Power Plant, demonstrating increased condenser efficiency (reduced fouling, improved heat transfer, improved tur ...
    • Optimizing Plant Performance
    W207A, Second Level -
    As part of a two-year study conducted by Black & Veatch on behalf of the Electric Power Research Institute (EPRI), researchers are studying the impacts of cycling and low-load generation on performanc ...
    • Optimizing Plant Performance
    W207A, Second Level -
    Vistra has worked to roll out more than 400 at-scale AI solutions to help it generate lower cost and more environmentally friendly and reliable power. One solution developed was the “heat rate optimiz ...
    • Optimizing Plant Performance
    W207A, Second Level -
    Slight misadjustments of mechanical and electrical components can cause great harm to a gas turbine’s rotating parts and impact its performance. This impact can also affect the heat recovery steam gen ...
    • Optimizing Plant Performance
    W207A, Second Level -
    Robotic inspection systems allow the plates of an above-ground fuel storage tank to be inspected without the need to remove any product from the storage tank, keeping the asset online. One such inspec ...
    • Optimizing Plant Performance
    W207A, Second Level -
    Physical sensors correctly measure fuel consumption at thermal power plants, but complete sensing is not always economically viable. To solve this challenge, machine learning models are used to predic ...
    • Optimizing Plant Performance
    W207A, Second Level -
    Through operational maintenance practices, aeroderivative gas turbine repairs and unit overhauls are changing, even as many users maintain gas turbines across steady-state and cyclic-loading practices ...
Optimizing Plant Performance
    • Optimizing Plant Performance
    W207A, Second Level -
    The hot section of the Stage 1 and 2 turbine blades, nozzles, and shrouds for LM6000 machines are prone to premature wear and replacement.    Chromalloy worked to repair hardware components in the CF6 ...
    • Optimizing Plant Performance
    W207A, Second Level -
    Mitsubishi Power Aero made upgrades to its existing fleet of FT8 and FT4000 gas turbines in an effort to increase power output, improve efficiency, and enhance reliability. In this session, the compan ...
    • Optimizing Plant Performance
    W207A, Second Level -
    Gas turbine optimization packages allow Siemens, Mitsubishi and GE turbines to achieve additional output, lower heat rate and extended maintenance intervals that are greater than standard OEM hardware ...
    • Optimizing Plant Performance
    W207A, Second Level -
    Hear from POWERGEN International’s 2022 Initiate! Winner, Rapid Water Technologies, about a tiny solution for your plant’s biggest water problems. Nanobubble technology transforms existing noncondensa ...
    • Optimizing Plant Performance
    W207A, Second Level -
    Power generation is one of the biggest sources of freshwater consumption in the U.S., mostly through cooling towers.  This session will discuss typical water consumption models and costs and explain h ...