Email sarah.toews@clarionevents.com to get access to conference proceedings
We're sorry, but we couldn't find any results that match your search criteria. Please try again with different keywords or filters.
Loading
The Evolving Power Plant
-
- The Evolving Power Plant
W203B, Second Level -Colorado Springs Utilities aims to get off coal by 2030, with a new power mix dependent on natural gas, solar, wind and hydropower. The utility is in the process of decommissioning its coal-fired Drak ... -
- The Evolving Power Plant
W203B, Second Level -DTE Energy’s Dearborn Central Energy Plant (CEP) is built to be a significantly cleaner source than the existing infrastructure to generate electricity and distribute chilled water, hot water and stea ...Speakers -
- The Evolving Power Plant
W203B, Second Level -A recent analysis from the Construction Industry Institute found that two-thirds of projects are 25% over budget while others are behind schedule or unable to meet primary business objectives. Digita ... -
- The Evolving Power Plant
W203B, Second Level -Current market trends show the energy landscape is transitioning towards more flexible energy systems with a rapidly increasing share of renewable energy, a declining inflexible baseload generation, a ...Sponsored by:
-
- The Evolving Power Plant
W203B, Second Level -A decision support system was developed for thermal power plants with combustion engines. Digital twin models allow plant operators to predict trends and operational deviations in an automated and rel ... -
- The Evolving Power Plant
W203B, Second Level -To help gas turbine plant operators make business decisions in an increasingly complex operating environment, digital twins help leverage data, enabling a better understanding of real-world operations ...
The Evolving Power Plant
-
- The Evolving Power Plant
W203B, Second Level -A panel discussion comprised of Utility and IPP operators of traditional power generation assets. This in-depth discussion will focus on the challenges for power generation assets to remain competitiv ...Chairperson -
- The Evolving Power Plant
W203B, Second Level -A problem with earthing systems of interconnected structures like solar power generation and battery storage systems has been identified by customers. The sites may be adequately earthed and bonded f ...Sponsored by:
-
- The Evolving Power Plant
W203B, Second Level -Ameren Missouri has used a centralized monitoring team to monitor its nuclear and fossil generation fleet for reliability and performance. However, Ameren recently upgraded its monitoring platform to ...Chairperson -
- The Evolving Power Plant
W203B, Second Level -Hear from EPC industry leaders in a panel discussion talking about how the EPC industry is leveraging virtual platforms in planning, designing, and executing projects; operating plants and facilities; ...Chairperson -
- The Evolving Power Plant
W203B, Second Level -This session will cover the key aspects of the journey to autonomous operation, from today's standard operation of power plants, to a fully autonomous future. Speakers will touch on some of the challe ...Sponsored by: