The Evolving Power Plant
    • The Evolving Power Plant
    W203B, Second Level -
    Colorado Springs Utilities aims to get off coal by 2030, with a new power mix dependent on natural gas, solar, wind and hydropower. The utility is in the process of decommissioning its coal-fired Drak ...
    • The Evolving Power Plant
    W203B, Second Level -
    DTE Energy’s Dearborn Central Energy Plant (CEP) is built to be a significantly cleaner source than the existing infrastructure to generate electricity and distribute chilled water, hot water and stea ...
    • The Evolving Power Plant
    W203B, Second Level -
    A recent analysis from the Construction Industry Institute found that two-thirds of projects are 25% over budget while others are behind schedule or unable to meet primary business objectives.  Digita ...
    • The Evolving Power Plant
    W203B, Second Level -
    Current market trends show the energy landscape is transitioning towards more flexible energy systems with a rapidly increasing share of renewable energy, a declining inflexible baseload generation, a ...

    Sponsored by:

    Wartsila

    • The Evolving Power Plant
    W203B, Second Level -
    A decision support system was developed for thermal power plants with combustion engines. Digital twin models allow plant operators to predict trends and operational deviations in an automated and rel ...
    • The Evolving Power Plant
    W203B, Second Level -
    To help gas turbine plant operators make business decisions in an increasingly complex operating environment, digital twins help leverage data, enabling a better understanding of real-world operations ...
The Evolving Power Plant
    • The Evolving Power Plant
    W203B, Second Level -
    A panel discussion comprised of Utility and IPP operators of traditional power generation assets. This in-depth discussion will focus on the challenges for power generation assets to remain competitiv ...
    • The Evolving Power Plant
    W203B, Second Level -
    A problem with earthing systems of interconnected structures like solar power generation and battery storage systems has been identified by customers.  The sites may be adequately earthed and bonded f ...

    Sponsored by:

    DEHN logo

    • The Evolving Power Plant
    W203B, Second Level -
    Ameren Missouri has used a centralized monitoring team to monitor its nuclear and fossil generation fleet for reliability and performance.  However, Ameren recently upgraded its monitoring platform to ...
    • The Evolving Power Plant
    W203B, Second Level -
    Hear from EPC industry leaders in a panel discussion talking about how the EPC industry is leveraging virtual platforms in planning, designing, and executing projects; operating plants and facilities; ...
    • The Evolving Power Plant
    W203B, Second Level -
    This session will cover the key aspects of the journey to autonomous operation, from today's standard operation of power plants, to a fully autonomous future. Speakers will touch on some of the challe ...