|
|
Data centers are becoming one of the most important drivers of new electricity demand, capacity planning and onsite generation strategy. This topic explores how large-load growth is changing generation development, interconnection priorities, procurement decisions, reliability expectations and commercial structures. For utilities, developers, EPCs and technology providers, serving data centers now requires faster execution, new supply approaches and a clear understanding of load timing and risk.
Data Center Educational Opportunities
Loading
10:15 AM
-
250D50 minsERCOT's interconnection process operates differently from the rest of the country. Under the connect-and-manage framework, each project is studied on its own merits under Planning Guide Section 5, rat …
-
250F50 minsData center energy campus projects are moving forward before load certainty, commercial terms, and interconnection outcomes are fully resolved. Developers and their partners are committing capital for …Chairperson
11:15 AM
-
Data Center & New Demand Zone - Exhibit Hall Booth 500450 minsData centers are arriving on utility interconnection queues faster than the grid was designed to absorb them, and the default responses, behind-the-meter isolation or large inflexible load requests, a …
1:30 PM
-
250C50 minsNERC has raised specific concerns about the grid stability implications of large-scale inverter-based resources, and co-located data center BESS deployments are at the center of that conversation. As …
-
251B50 minsAI data center load profiles, characterized by rapid, large-magnitude transients, create subsynchronous torsional interaction risks for nearby synchronous generators that conventional interconnection …
-
250A50 minsMilitary installations operate under reliability requirements that most utilities and IPPs rarely face: uninterrupted power during grid outages, cyber events, and extreme weather, with no tolerance fo …
-
250D50 minsEnhanced geothermal systems are moving from research programs to operating projects, and the timeline to commercial scale is compressing. This panel brings together subsurface technology developers, a …
-
Data Center & New Demand Zone - Exhibit Hall Booth 500450 minsInterconnection queues, equipment constraints and transmission siting challenges are delaying the large-load connections that data centers and advanced manufacturing customers need on 12 to 24-month t …
2:30 PM
-
251B50 minsAs inverter-based resources displace synchronous generation, the inertia and reactive power that large rotating machines provided are declining faster than most grid operators planned for. Synchronous …
-
250F50 minsCo-locating prime power generation at a data center campus, whether natural gas turbines, reciprocating engines, or combined-cycle systems, converts a facility that was previously a minor emissions so …
10:15 AM
-
250F50 minsPower generation and data center construction projects are increasingly competing for the same pool of electricians, pipefitters, welders, millwrights, and commissioning personnel, often in the same g …
-
250E50 minsThe electric sector is entering a new cyber-physical risk era. Generation, transmission, distribution, substations, distributed energy resources, data centers, private generation, vendors, cloud platf …
11:15 AM
-
251A50 minsHyperscale data centers require five-nines reliability while facing interconnection queues that stretch years and permitting timelines that compress development windows. Renewable generation paired wi …Chairperson
-
Data Center & New Demand Zone - Exhibit Hall Booth 500450 minsAs hyperscalers and colocation developers move toward behind-the-meter and off-grid generation at gigawatt-scale campuses, the engineering requirements for onsite power plants have grown substantially …
1:30 PM
-
250C50 minsHyperscale data center load is arriving on timelines that conventional interconnection and transmission development cannot match. The structural mismatch between when capacity is needed and when it ca …
-
Data Center & New Demand Zone - Exhibit Hall Booth 500450 minsLoad growth from data centers and AI infrastructure is compressing the timeline between resource planning decisions and the capacity the grid actually needs. For generation owner-operators managing ex …
2:30 PM
-
250E50 minsOn-site generation at data center campuses is growing faster than the decarbonization frameworks designed to govern it. Diesel backup conflicts with emissions targets. Natural gas prime power triggers …
-
250B50 minsGigawatt-scale AI campuses need more than electricity. They need transmission access, cooling water, fuel infrastructure, industrial permitting capacity and operational resilience, and they need all o …Chairperson
-
251A50 minsAs hyperscalers buy compute from neo-cloud and colocation providers rather than building their own facilities, the electricity behind that compute shifts from the buyer's Scope 2 into their Scope 3, a …
-
Data Center & New Demand Zone - Exhibit Hall Booth 500450 minsHyperscale data centers need power on 12 to 24-month timelines. Interconnection queues run five years or longer. Meanwhile, oil and gas producers across North America are managing stranded gas, flarin …
9:30 AM
-
Data Center & New Demand Zone - Exhibit Hall Booth 500450 minsData centers require 99.999% reliability, roughly five minutes of downtime per year. Achieving that with a fleet of reciprocating gensets means procuring more units than the load requires, and knowing …
10:30 AM
-
250C50 minsSupercritical CO₂ power cycles have been in development for two decades. They are now approaching commercial deployment, and the applications relevant to the POWERGEN audience are specific: gas turbin …
-
Data Center & New Demand Zone - Exhibit Hall Booth 500450 minsAI-driven data centers are arriving on power systems as large, largely inflexible loads. They do not have to stay that way. This session examines how a major power producer is working with NVIDIA to m …
11:30 AM
-
250C50 minsAI data centers have more pressure on timelines than any industrial buildout in history. At the same time, gas turbine lead times are a half-decade long, new transmission seems untenable, and it is ha …Chairperson
-
Data Center & New Demand Zone - Exhibit Hall Booth 500450 minsInterconnection queues in many regions now run five to eight years. Data center campuses are arriving in 50 to 300 MW blocks on 12 to 24 month timelines. The mismatch is a system planning problem that …
Other Data Center News
Visit Our Official Media Partner, Factor This Power Engineering, for more Data Center News
Army offers up underutilized military land to private developers for new power generation and storage
The U.S. Army selected three private developers, including Ameresco, Indelible-Bloom, and Frontier Power USA, to build power generation projects on military bases, enhancing energy resilience.
September 25, 2026


