Energy storage and hybrid configurations are becoming more important as operators seek flexibility, resilience and better ways to optimize generation portfolios. This topic examines storage integration, controls, dispatch strategy, project economics, reliability considerations and the practical lessons emerging from paired and hybrid systems. It is relevant to utilities, IPPs and large power users looking to capture more operational and commercial value from their assets.

Energy Storage & Hybrids Educational Opportunities 

Loading
1:00 PM
  1. 250B
    120 mins
    These courses are included for all-access badge holders. You can pre-register for your preferred course; however, seating is available on a first-come, first-served basis. COURSE DESCRIPTION:  Battery …
11:15 AM
  1. 250A
    50 mins
    The proliferation of distributed batteries, behind-the-meter assets and aggregated virtual power plants is reshaping how grid operators think about flexibility. This series of presentations covers ope …
  2. Data Center & New Demand Zone - Exhibit Hall Booth 5004
    50 mins
    Data centers are arriving on utility interconnection queues faster than the grid was designed to absorb them, and the default responses, behind-the-meter isolation or large inflexible load requests, a …
  3. 251A
    50 mins
    The challenge in a competitive utility renewable tender is not simply submitting the lowest cost. It is developing a project that can be financed, constructed and operated on the assumptions embedded …
1:30 PM
  1. 250C
    50 mins
    NERC has raised specific concerns about the grid stability implications of large-scale inverter-based resources, and co-located data center BESS deployments are at the center of that conversation. As …
  2. 250A
    50 mins
    Military installations operate under reliability requirements that most utilities and IPPs rarely face: uninterrupted power during grid outages, cyber events, and extreme weather, with no tolerance fo …
2:30 PM
  1. Data Center & New Demand Zone - Exhibit Hall Booth 5004
    50 mins
    The IRA's domestic content bonus adders and growing geopolitical scrutiny of Chinese battery supply chains have fundamentally altered how developers source and structure BESS projects. This panel will …
10:15 AM
  1. 250A
    50 mins
    As utility-scale BESS deployments accelerate, the gap between evolving fire codes and on-the-ground implementation remains a critical industry challenge. This session draws on submissions from the Fir …
  2. 251A
    50 mins
    In high-resource solar areas, co-locating oversized solar arrays with long-duration battery storage can produce firm capacity factors that rival geothermal or nuclear, at substantially lower cost. A 1 …
11:15 AM
  1. 250A
    50 mins
    Community opposition is one of the most underestimated risks in utility-scale BESS development, with projects facing delays or cancellations not due to technical or regulatory failure, but due to erod …
  2. 251A
    50 mins
    Hyperscale data centers require five-nines reliability while facing interconnection queues that stretch years and permitting timelines that compress development windows. Renewable generation paired wi …
1:30 PM
  1. 250C
    50 mins
    Hyperscale data center load is arriving on timelines that conventional interconnection and transmission development cannot match. The structural mismatch between when capacity is needed and when it ca …
9:30 AM
  1. 250A
    50 mins
    How much of a battery storage system's lifetime performance is determined at the cell level, and how much can be recovered through operational intelligence? That question has direct implications for w …
10:30 AM
  1. 250A
    50 mins
    How a battery storage system is accredited in a capacity market, whether under an effective load-carrying capability framework or a unforced capacity construct, directly affects project economics and …
  2. Data Center & New Demand Zone - Exhibit Hall Booth 5004
    50 mins
    AI-driven data centers are arriving on power systems as large, largely inflexible loads. They do not have to stay that way. This session examines how a major power producer is working with NVIDIA to m …
11:30 AM
  1. Data Center & New Demand Zone - Exhibit Hall Booth 5004
    50 mins
    Interconnection queues in many regions now run five to eight years. Data center campuses are arriving in 50 to 300 MW blocks on 12 to 24 month timelines. The mismatch is a system planning problem that …

Other Energy Storage & Hybrids News

Visit Our Official Media Partner, Factor This Power Engineering, for more Energy Storage & Hybrids News

Army offers up underutilized military land to private developers for new power generation and storage

The U.S. Army selected three private developers, including Ameresco, Indelible-Bloom, and Frontier Power USA, to build power generation projects on military bases, enhancing energy resilience.
September 25, 2026

Is it the future yet? | Factor This Brief

As the reality of nuclear fusion approaches, Base Power attracts a billion bucks and launches a new battery, Eolian starts construction on PJM's biggest BESS, Avantus doubles its credit facility, Antares raises $470M for microreactors, and Sungrow commissions a critical solar-plus-storage project in Sierra Lione.
August 11, 2026

PJM accepts over 700 generation projects in new ‘first-ready, first-served’ queue

PJM Interconnection hasw announced 715 new generation projects, capable of over 200 gigawatts, qualified for study under a reformed interconnection process.
August 06, 2026

Federal government to turn a Kentucky uranium plant into an AI data center and gas power complex

The U.S. Department of Energy is partnering with Brookfield Asset Management to develop a $100 billion AI data center and power plant at the Paducah Gaseous Diffusion Plant in Kentucky.
August 04, 2026

 

VIEW FULL AGENDA