As project schedules tighten and costs become harder to control, contracting strategy has become a defining factor in project success. This topic examines EPC and EPCM structures, scope definition, risk allocation, change management, guarantees, supply chain exposure and lessons from recent project execution. For developers, utilities, EPCs and OEM partners, better contract decisions can materially improve bankability, schedule certainty and overall delivery performance.

EPC Contracting & Risk Management Educational Opportunities 

Loading
10:15 AM
  1. 250F
    50 mins
    Data center energy campus projects are moving forward before load certainty, commercial terms, and interconnection outcomes are fully resolved. Developers and their partners are committing capital for …
11:15 AM
  1. 250D
    50 mins
    Gas turbine order books are full into the next decade, interconnection queues are lengthening, and data center load growth is compressing the timeline between resource planning decisions and capacity …
  2. 251A
    50 mins
    The challenge in a competitive utility renewable tender is not simply submitting the lowest cost. It is developing a project that can be financed, constructed and operated on the assumptions embedded …
1:30 PM
  1. 250F
    50 mins
    Getting a power generation project from development decision to commercial operation has always been complex. In the current market, the variables are compounding: gas turbine lead times stretching to …
2:30 PM
  1. 250D
    50 mins
    Geothermal offers firm, carbon-free capacity. Getting there requires navigating a set of execution risks that early projects are now quantifying in practice.  This session examines geothermal from the …
  2. Exhibit Hall - Data Center & New Demand Zone Booth #5004
    50 mins
    The IRA's domestic content bonus adders and growing geopolitical scrutiny of Chinese battery supply chains have fundamentally altered how developers source and structure BESS projects. This panel will …
  3. 250B
    50 mins
    When an aging 25 MW CHP asset at an industrial facility in Ohio reached end of life, the customer needed more behind-the-meter capacity, not a construction project to manage. DTE Vantage is delivering …
10:15 AM
  1. 250F
    50 mins
    Power generation and data center construction projects are increasingly competing for the same pool of electricians, pipefitters, welders, millwrights, and commissioning personnel, often in the same g …
11:15 AM
  1. 250F
    50 mins
    New generation projects are being proposed and committed in a market constrained by long-lead equipment, limited skilled labor and a shortage of experienced project personnel. In this environment, sch …
1:30 PM
  1. 250F
    50 mins
    Gas turbine lead times stretching to 2029 and beyond have forced a structural change in how thermal power projects are executed. Owners and developers are now procuring long-lead powertrain equipment …
  2. 250B
    50 mins
    Gas turbine frame orders now carry delivery dates extending to 2029 and beyond. Large power transformer lead times have lengthened materially. EPC labor is being competed for across simultaneous power …
2:30 PM
  1. 250F
    50 mins
    Most megaproject cost overruns and schedule failures originate not in construction but in front-end decisions made under incomplete information, scope that was not fully defined, delivery strategies t …
9:30 AM
  1. 250E
    50 mins
    Retired coal sites often come with something new generation sites do not: existing transmission interconnection, water systems, fuel infrastructure and balance-of-plant assets that can materially comp …

Other EPC Contracting & Risk Management News

Visit Our Official Media Partner, Factor This Power Engineering, for more EPC Contracting & Risk Management News

NRG Energy to sell 4.9 GW of gas generation back to LS Power in $4B portfolio shakeup

Less than a year after closing its LS Power acquisition, NRG is selling six gas plants back for $4 billion after what it called an unsolicited offer it couldn’t pass up.
November 09, 2026

PJM puts generator performance at the center of its cold-weather plans

Forecast winter demand has climbed 7,500 MW since 2022 and is now above PJM’s all-time peak, while new supply lags and reserve margins tighten.
November 09, 2026

People on the Move: Southern Company, Fluence Energy welcome new executive leaders

Leadership changes are reshaping the power industry as winter approaches, with Southern Company, Fluence Energy, GE Vernova and Caterpillar announcing executive appointments, transitions and retirements across utility generation, energy storage and manufacturing.
November 09, 2026

POWERGEN™ 2027 Announces Keynote Program Featuring Industry Leaders Addressing Grid Reliability, AI, and the Future of Power Generation

Utility, grid operator and security executives headline a keynote program focused on demand growth, grid readiness and operational resilience.
November 06, 2026

 

VIEW FULL AGENDA

ATTEND

EXHIBIT/SPONSOR