Interconnection is now one of the most important gating factors in generation development, repowers and large-load projects. This topic explores queue reform, study timelines, network upgrade costs, transmission constraints, site selection and the engineering and commercial decisions that determine whether projects move forward. For developers, utilities and large power users, interconnection risk increasingly drives schedule, cost and overall project viability.


 

Interconnection Educational Opportunities 

Loading
10:15 AM
  1. 250D
    50 mins
    ERCOT's interconnection process operates differently from the rest of the country. Under the connect-and-manage framework, each project is studied on its own merits under Planning Guide Section 5, rat …
  2. 250F
    50 mins
    Data center energy campus projects are moving forward before load certainty, commercial terms, and interconnection outcomes are fully resolved. Developers and their partners are committing capital for …
11:15 AM
  1. Exhibit Hall - Data Center & New Demand Zone Booth #5004
    50 mins
    Data centers are arriving on utility interconnection queues faster than the grid was designed to absorb them, and the default responses, behind-the-meter isolation or large inflexible load requests, a …
1:30 PM
  1. 250C
    50 mins
    NERC has raised specific concerns about the grid stability implications of large-scale inverter-based resources, and co-located data center BESS deployments are at the center of that conversation. As …
  2. 251B
    50 mins
    AI data center load profiles, characterized by rapid, large-magnitude transients, create subsynchronous torsional interaction risks for nearby synchronous generators that conventional interconnection …
  3. 250F
    50 mins
    Getting a power generation project from development decision to commercial operation has always been complex. In the current market, the variables are compounding: gas turbine lead times stretching to …
2:30 PM
  1. 250D
    50 mins
    Geothermal offers firm, carbon-free capacity. Getting there requires navigating a set of execution risks that early projects are now quantifying in practice.  This session examines geothermal from the …
11:15 AM
  1. 251A
    50 mins
    In high-resource solar areas, co-locating oversized solar arrays with long-duration battery storage can produce firm capacity factors that rival geothermal or nuclear, at substantially lower cost. A 1 …
1:30 PM
  1. 250C
    50 mins
    Hyperscale data center load is arriving on timelines that conventional interconnection and transmission development cannot match. The structural mismatch between when capacity is needed and when it ca …
9:30 AM
  1. Exhibit Hall - Center Stage Booth #3535
    50 mins
    Data center power strategies do not develop in a vacuum. Utilities are being asked to serve extremely large loads on accelerated timelines while managing reserve margins, transmission constraints, int …
11:30 AM
  1. Exhibit Hall - Data Center & New Demand Zone Booth #5004
    50 mins
    Interconnection queues in many regions now run five to eight years. Data center campuses are arriving in 50 to 300 MW blocks on 12 to 24 month timelines. The mismatch is a system planning problem that …

Other Interconnection News

Visit Our Official Media Partner, Factor This Power Engineering, for more Interconnection News

PJM puts generator performance at the center of its cold-weather plans

Forecast winter demand has climbed 7,500 MW since 2022 and is now above PJM’s all-time peak, while new supply lags and reserve margins tighten.
November 09, 2026

NRC finalizes rule to fast-track commercial licensing of advanced nuclear reactors

A new U.S. Nuclear Regulatory Commission rule aims to speed advanced nuclear reactor licensing by allowing developers to reuse federal safety evaluations and testing.
October 27, 2026

Can this bipartisan Senate bill fix the grueling energy permitting timeline?

Senators from both parties reached a deal on legislation to expedite permitting for energy projects, aiming for a vote after the midterms.
October 02, 2026

Hydropower licensing requirements have exploded. The industry says the grid could pay.

With more than 12 GW of hydropower facing relicensing over the next decade, NHA says rising regulatory requirements could threaten existing generation.