As demand grows and new generation takes longer to bring online, upgrades to existing assets are becoming an increasingly important path to faster capacity, better performance and improved reliability. This topic explores the planning and execution of upgrade strategies that help owner-operators increase output, improve efficiency, modernize plant systems and get more value from existing sites and infrastructure. The emphasis is on practical, executable upgrades that fit real operating schedules, reduce development hurdles and help assets respond to changing market and system needs.

Lifecycle Management Educational Opportunities 

Loading
1:00 PM
  1. 250A
    180 mins
    These courses are included for all-access badge holders. You can pre-register for your preferred course; however, seating is available on a first-come, first-served basis. COURSE DESCRIPTION:   Most p …
10:15 AM
  1. O&M and Reliability Zone - Exhibit Hall Booth 4455
    50 mins
    Bayswater is a large coal-fired station that has spent the past five years becoming something it was never designed to be: a flexible, market-responsive asset in a grid increasingly shaped by solar an …
  2. 250B
    50 mins
    Flexible coal operation starts in the mill, not the boiler. As renewable penetration forces coal units to cycle deeper and more frequently, pulverizer performance becomes a direct constraint on plant …
  3. 250E
    50 mins
    Generation plants that have been repowered or operated across multiple technology eras accumulate a common problem: the information needed to plan, operate, troubleshoot, and maintain the facility exi …
  4. 251A
    50 mins
    Much of the U.S. wind fleet is approaching or past the 20-year mark, and repowering economics increasingly depend on how much existing balance-of-plant infrastructure can be reused rather than replace …
11:15 AM
  1. 251B
    50 mins
    With new combined-cycle lead times stretching to 2029 and beyond, the strategic value of optimizing existing gas turbine assets has never been more direct. This session presents an updated fleet-wide …
  2. 250C
    50 mins
    Replacing analog safety systems with digital instrumentation and controls at a commercial nuclear reactor is a first-of-a-kind undertaking for most utilities. The engineering is complex, but the licen …
2:30 PM
  1. 250B
    50 mins
    When an aging 25 MW CHP asset at an industrial facility in Ohio reached end of life, the customer needed more behind-the-meter capacity, not a construction project to manage. DTE Vantage is delivering …
10:15 AM
  1. O&M and Reliability Zone - Exhibit Hall Booth 4455
    50 mins
    Feedwater system erosion, high-energy piping degradation, and boiler component failures follow predictable patterns at most thermal plants. The repair decisions made during outages, often under time p …
11:15 AM
  1. O&M and Reliability Zone - Exhibit Hall Booth 4455
    50 mins
    Managing a portfolio of thermoelectric assets across multiple regions creates a familiar tension: local operating units develop strong execution capability but limited integration, and the inconsisten …
  2. 250E
    50 mins
    MRO inventory is where equipment reliability and working capital intersect. Overstocking creates obsolescence risk and ties up capital. Understocking drives stockouts, expedited freight, and extended  …
9:30 AM
  1. 250A
    50 mins
    How much of a battery storage system's lifetime performance is determined at the cell level, and how much can be recovered through operational intelligence? That question has direct implications for w …
  2. O&M and Reliability Zone - Exhibit Hall Booth 4455
    50 mins
    A 2 x 250 MW lignite-fired plant in India increased its plant load factor from 50% to 65% through a focused O&M program targeting the highest-leverage reliability and performance gaps. The program cov …
10:30 AM
  1. O&M and Reliability Zone - Exhibit Hall Booth 4455
    50 mins
    When a transformer fails or a critical component goes down, recovery time is increasingly determined by supply chain availability, long manufacturing queues, specialized logistics and coordination dep …
11:30 AM
  1. O&M and Reliability Zone - Exhibit Hall Booth 4455
    50 mins
    Gas-side fouling deep within HRSG harp sections, including ferrous oxide scale, ammonium bisulfate deposits from SCR ammonia slip and insulation debris, accumulates on finned tube bundles where conven …
  2. 250B
    50 mins
    Every major U.S. nuclear utility is now planning or executing large-scale digital instrumentation and control upgrades. Aging analog infrastructure, subsequent license renewals extending plant life to …

Other Lifecycle Management News

Visit Our Official Media Partner, Factor This Power Engineering, for more Lifecycle Management News

Army offers up underutilized military land to private developers for new power generation and storage

The U.S. Army selected three private developers, including Ameresco, Indelible-Bloom, and Frontier Power USA, to build power generation projects on military bases, enhancing energy resilience.
September 25, 2026

The cloud needs an air permit

Data centers are discovering that diesel backup generators trigger some of the most complex air permitting requirements in environmental law.
September 17, 2026

Baker Hughes gas turbines to support up to 1.8 GW of behind-the-meter data center power

Kodiak Gas Services and Baker Hughes have formed a multi-year agreement for power generation solutions to enhance Kodiak's energy infrastructure, aiming for 1.8 GW capacity by 2030.
July 10, 2026

Brookfield, Bloom Energy expand partnership to $25 billion framework for onsite data center power

Bloom Energy and Brookfield expanded their partnership to finance AI infrastructure projects, increasing funding from $5 billion to $25 billion, enhancing global fuel cell deployment.
July 09, 2026

 

VIEW FULL AGENDA

ATTEND

EXHIBIT/SPONSOR