| Onsite power is gaining momentum as large power users look for faster, more reliable and more controllable energy supply. This topic explores technology selection, permitting, fuel access, integration, economics and operating strategy for self-generation across data centers, industrial sites, campuses and other large-load applications. It is about what it really takes to develop, build and operate megawatt-scale generation at or near the point of use.
|
Onsite Power Educational Opportunities
Loading
1:00 PM
-
250B120 minsThese courses are included for all-access badge holders. You can pre-register for your preferred course; however, seating is available on a first-come, first-served basis. COURSE DESCRIPTION: Battery …
10:30 AM
-
251D120 minsPre-registration for this event is required and includes an additional fee. Visit your registration resource center or reach out to info@powergen.com. Onsite Power Codes and Standards: Fundamentals …
11:15 AM
-
Exhibit Hall - Data Center & New Demand Zone Booth #500450 minsData centers are arriving on utility interconnection queues faster than the grid was designed to absorb them, and the default responses, behind-the-meter isolation or large inflexible load requests, a …
1:30 PM
-
250C50 minsNERC has raised specific concerns about the grid stability implications of large-scale inverter-based resources, and co-located data center BESS deployments are at the center of that conversation. As …
-
250A50 minsMilitary installations operate under reliability requirements that most utilities and IPPs rarely face: uninterrupted power during grid outages, cyber events, and extreme weather, with no tolerance fo …
-
Exhibit Hall - Data Center & New Demand Zone Booth #500450 minsInterconnection queues, equipment constraints and transmission siting challenges are delaying the large-load connections that data centers and advanced manufacturing customers need on 12 to 24-month t …
-
Exhibit Hall - Center Stage Booth #353550 minsThe rapid growth of on-site and behind-the-meter generation at data centers is introducing permitting and emissions compliance challenges that many developers and equipment providers have not had to n …
2:30 PM
-
Exhibit Hall - O&M and Reliability Zone Booth #445550 minsIn most North American utilities, diesel generation is backup. At Bahamas Power & Light, it is the baseload that keeps a nation lit. Operating a diesel-driven island grid means no neighboring system t …Chairperson
-
250F50 minsCo-locating prime power generation at a data center campus, whether natural gas turbines, reciprocating engines, or combined-cycle systems, converts a facility that was previously a minor emissions so …
-
250B50 minsWhen an aging 25 MW CHP asset at an industrial facility in Ohio reached end of life, the customer needed more behind-the-meter capacity, not a construction project to manage. DTE Vantage is delivering …
10:15 AM
-
250F50 minsPower generation and data center construction projects are increasingly competing for the same pool of electricians, pipefitters, welders, millwrights, and commissioning personnel, often in the same g …
-
251A50 minsHyperscale data centers require five-nines reliability while facing interconnection queues that stretch years and permitting timelines that compress development windows. Renewable generation paired wi …Chairperson
10:30 AM
-
251D120 minsPre-registration for this event is required and includes an additional fee. Visit your registration resource center or reach out to info@powergen.com. Think You Know Generator Sizing? What electrica …
11:15 AM
-
Exhibit Hall - Data Center & New Demand Zone Booth #500450 minsAs hyperscalers and colocation developers move toward behind-the-meter and off-grid generation at gigawatt-scale campuses, the engineering requirements for onsite power plants have grown substantially …
1:30 PM
-
250C50 minsHyperscale data center load is arriving on timelines that conventional interconnection and transmission development cannot match. The structural mismatch between when capacity is needed and when it ca …
-
250A50 minsCombined heat and power has served industrial facilities, institutions and commercial customers for decades. Right now the market is shifting. Data center load growth, grid delivery delays, biogas man …
-
251B50 minsThe Centenario lithium mine project in the Argentine Andes required a 27 MW cogeneration plant to supply both electricity and high-quality heat at 4,000 metres above sea level. Supporting an energy-in …
2:30 PM
-
250E50 minsOn-site generation at data center campuses is growing faster than the decarbonization frameworks designed to govern it. Diesel backup conflicts with emissions targets. Natural gas prime power triggers …
-
Exhibit Hall - O&M and Reliability Zone Booth #445550 minsDTE Electric has operated mobile restoration assets as a formal component of its N-1 contingency planning since 2002, deploying mobile generators, mobile ISO transformer trailers and mobile pole ISO t …Chairperson
-
Exhibit Hall - Data Center & New Demand Zone Booth #500450 minsHyperscale data centers need power on 12 to 24-month timelines. Interconnection queues run five years or longer. Meanwhile, oil and gas producers across North America are managing stranded gas, flarin …
9:30 AM
-
Exhibit Hall - Data Center & New Demand Zone Booth #500450 minsData centers require 99.999% reliability, roughly five minutes of downtime per year. Achieving that with a fleet of reciprocating gensets means procuring more units than the load requires, and knowing …
11:30 AM
-
250C50 minsAI data centers have more pressure on timelines than any industrial buildout in history. At the same time, gas turbine lead times are a half-decade long, new transmission seems untenable, and it is ha …Chairperson
-
Exhibit Hall - Data Center & New Demand Zone Booth #500450 minsInterconnection queues in many regions now run five to eight years. Data center campuses are arriving in 50 to 300 MW blocks on 12 to 24 month timelines. The mismatch is a system planning problem that …
Other Onsite Power News
America’s data center boom is running into a grid-sized problem
America’s data center boom is moving fast, but the infrastructure needed to power it isn’t always keeping pace. From transmission and fuel constraints to construction setbacks, major projects are finding that turning billions of dollars in investment into energized megawatts can take longer than planned.