Onsite power is gaining momentum as large power users look for faster, more reliable and more controllable energy supply. This topic explores technology selection, permitting, fuel access, integration, economics and operating strategy for self-generation across data centers, industrial sites, campuses and other large-load applications. It is about what it really takes to develop, build and operate megawatt-scale generation at or near the point of use.

Sponsored by:

Alliance North America Corporation 

Alliance North America Corporation

Onsite Power Educational Opportunities 

Loading
1:00 PM
  1. 250B
    120 mins
    These courses are included for all-access badge holders. You can pre-register for your preferred course; however, seating is available on a first-come, first-served basis. COURSE DESCRIPTION:  Battery …
10:30 AM
  1. 251D
    120 mins
    Pre-registration for this event is required and includes an additional fee. Visit your registration resource center or reach out to info@powergen.com.  Onsite Power Codes and Standards: Fundamentals   …
11:15 AM
  1. Exhibit Hall - Data Center & New Demand Zone Booth #5004
    50 mins
    Data centers are arriving on utility interconnection queues faster than the grid was designed to absorb them, and the default responses, behind-the-meter isolation or large inflexible load requests, a …
1:30 PM
  1. 250C
    50 mins
    NERC has raised specific concerns about the grid stability implications of large-scale inverter-based resources, and co-located data center BESS deployments are at the center of that conversation. As …
  2. 250A
    50 mins
    Military installations operate under reliability requirements that most utilities and IPPs rarely face: uninterrupted power during grid outages, cyber events, and extreme weather, with no tolerance fo …
  3. Exhibit Hall - Data Center & New Demand Zone Booth #5004
    50 mins
    Interconnection queues, equipment constraints and transmission siting challenges are delaying the large-load connections that data centers and advanced manufacturing customers need on 12 to 24-month t …
  4. Exhibit Hall - Center Stage Booth #3535
    50 mins
    The rapid growth of on-site and behind-the-meter generation at data centers is introducing permitting and emissions compliance challenges that many developers and equipment providers have not had to n …
2:30 PM
  1. Exhibit Hall - O&M and Reliability Zone Booth #4455
    50 mins
    In most North American utilities, diesel generation is backup. At Bahamas Power & Light, it is the baseload that keeps a nation lit. Operating a diesel-driven island grid means no neighboring system t …
  2. 250F
    50 mins
    Co-locating prime power generation at a data center campus, whether natural gas turbines, reciprocating engines, or combined-cycle systems, converts a facility that was previously a minor emissions so …
  3. 250B
    50 mins
    When an aging 25 MW CHP asset at an industrial facility in Ohio reached end of life, the customer needed more behind-the-meter capacity, not a construction project to manage. DTE Vantage is delivering …
10:15 AM
  1. 250F
    50 mins
    Power generation and data center construction projects are increasingly competing for the same pool of electricians, pipefitters, welders, millwrights, and commissioning personnel, often in the same g …
  2. 251A
    50 mins
    Hyperscale data centers require five-nines reliability while facing interconnection queues that stretch years and permitting timelines that compress development windows. Renewable generation paired wi …
10:30 AM
  1. 251D
    120 mins
    Pre-registration for this event is required and includes an additional fee. Visit your registration resource center or reach out to info@powergen.com.  Think You Know Generator Sizing?  What electrica …
11:15 AM
  1. Exhibit Hall - Data Center & New Demand Zone Booth #5004
    50 mins
    As hyperscalers and colocation developers move toward behind-the-meter and off-grid generation at gigawatt-scale campuses, the engineering requirements for onsite power plants have grown substantially …
1:30 PM
  1. 250C
    50 mins
    Hyperscale data center load is arriving on timelines that conventional interconnection and transmission development cannot match. The structural mismatch between when capacity is needed and when it ca …
  2. 250A
    50 mins
    Combined heat and power has served industrial facilities, institutions and commercial customers for decades. Right now the market is shifting. Data center load growth, grid delivery delays, biogas man …
  3. 251B
    50 mins
    The Centenario lithium mine project in the Argentine Andes required a 27 MW cogeneration plant to supply both electricity and high-quality heat at 4,000 metres above sea level. Supporting an energy-in …
2:30 PM
  1. 250E
    50 mins
    On-site generation at data center campuses is growing faster than the decarbonization frameworks designed to govern it. Diesel backup conflicts with emissions targets. Natural gas prime power triggers …
  2. Exhibit Hall - O&M and Reliability Zone Booth #4455
    50 mins
    DTE Electric has operated mobile restoration assets as a formal component of its N-1 contingency planning since 2002, deploying mobile generators, mobile ISO transformer trailers and mobile pole ISO t …
  3. Exhibit Hall - Data Center & New Demand Zone Booth #5004
    50 mins
    Hyperscale data centers need power on 12 to 24-month timelines. Interconnection queues run five years or longer. Meanwhile, oil and gas producers across North America are managing stranded gas, flarin …
9:30 AM
  1. Exhibit Hall - Data Center & New Demand Zone Booth #5004
    50 mins
    Data centers require 99.999% reliability, roughly five minutes of downtime per year. Achieving that with a fleet of reciprocating gensets means procuring more units than the load requires, and knowing …
11:30 AM
  1. 250C
    50 mins
    AI data centers have more pressure on timelines than any industrial buildout in history. At the same time, gas turbine lead times are a half-decade long, new transmission seems untenable, and it is ha …
  2. Exhibit Hall - Data Center & New Demand Zone Booth #5004
    50 mins
    Interconnection queues in many regions now run five to eight years. Data center campuses are arriving in 50 to 300 MW blocks on 12 to 24 month timelines. The mismatch is a system planning problem that …

Gas turbines and batteries are cashing in as AI data centers can’t wait for the grid

Grid delays and surging AI demand are fueling a behind-the-meter power boom as data centers turn to gas turbines, natural gas engines and battery storage to bring projects online faster.
November 04, 2026

Black Hills to build 564 MW of new gas, manage 2.1 GW microgrid for Google data center in Wyoming

Black Hills Corp. plans $1.8 billion in natural gas generation and will manage a 2.1-GW microgrid to power Google's planned data center in Cheyenne, Wyoming.
October 09, 2026

America’s data center boom is running into a grid-sized problem

America’s data center boom is moving fast, but the infrastructure needed to power it isn’t always keeping pace. From transmission and fuel constraints to construction setbacks, major projects are finding that turning billions of dollars in investment into energized megawatts can take longer than planned.
October 05, 2026

Data centers are skipping the grid queue — and turning to on-site power

Data centers are tired of waiting for the grid. A new forecast shows developers increasingly turning to behind-the-meter generation to get projects powered faster.
October 05, 2026