| Outage execution is under greater pressure as plants cycle more frequently, maintenance windows narrow and skilled labor becomes harder to secure. This topic focuses on outage scope definition, planning discipline, contractor coordination, parts readiness, schedule control, safety and return-to-service performance. The goal is practical: reduce risk, improve execution and get critical assets back online on time and on budget.
|
Outage Planning & Execution Educational Opportunities
Loading
1:00 PM
-
250A180 minsThese courses are included for all-access badge holders. You can pre-register for your preferred course; however, seating is available on a first-come, first-served basis. COURSE DESCRIPTION: Most p …
11:15 AM
-
O&M and Reliability Zone - Exhibit Hall Booth 445550 minsSteam boilers were designed for steady baseload operation. As grid conditions push thermal fleets toward more frequent starts, deeper turndowns and aggressive cycling, the operating envelope shifts we …
-
250C50 minsReplacing analog safety systems with digital instrumentation and controls at a commercial nuclear reactor is a first-of-a-kind undertaking for most utilities. The engineering is complex, but the licen …
2:30 PM
-
O&M and Reliability Zone - Exhibit Hall Booth 445550 minsIn most North American utilities, diesel generation is backup. At Bahamas Power & Light, it is the baseload that keeps a nation lit. Operating a diesel-driven island grid means no neighboring system t …Chairperson
10:15 AM
-
O&M and Reliability Zone - Exhibit Hall Booth 445550 minsFeedwater system erosion, high-energy piping degradation, and boiler component failures follow predictable patterns at most thermal plants. The repair decisions made during outages, often under time p …
-
250C50 minsAn accelerating retirement wave in plant operations is removing institutional knowledge faster than conventional training programs can replace it. In high-consequence environments, including outage wo …
2:30 PM
-
O&M and Reliability Zone - Exhibit Hall Booth 445550 minsDTE Electric has operated mobile restoration assets as a formal component of its N-1 contingency planning since 2002, deploying mobile generators, mobile ISO transformer trailers and mobile pole ISO t …Chairperson
9:30 AM
-
O&M and Reliability Zone - Exhibit Hall Booth 445550 minsA 2 x 250 MW lignite-fired plant in India increased its plant load factor from 50% to 65% through a focused O&M program targeting the highest-leverage reliability and performance gaps. The program cov …ChairpersonSpeakers
11:30 AM
-
O&M and Reliability Zone - Exhibit Hall Booth 445550 minsGas-side fouling deep within HRSG harp sections, including ferrous oxide scale, ammonium bisulfate deposits from SCR ammonia slip and insulation debris, accumulates on finned tube bundles where conven …