| Project development and delivery are under growing pressure as demand rises, timelines compress and execution risks multiply across the power sector. This topic covers how projects move from concept to commercial operation, including siting, permitting, contracting, procurement, engineering, sequencing, risk management and delivery strategy. The emphasis is on lessons that help developers, utilities, EPCs and suppliers execute better and bring capacity online successfully.
|
Project Development & Delivery Educational Opportunities
Loading
9:00 AM
-
250A180 minsThese courses are included for all-access badge holders. You can pre-register for your preferred course; however, seating is available on a first-come, first-served basis. COURSE DESCRIPTION: Utilitie …
1:00 PM
-
250B120 minsThese courses are included for all-access badge holders. You can pre-register for your preferred course; however, seating is available on a first-come, first-served basis. COURSE DESCRIPTION: Battery …
10:15 AM
-
Thermal & Nuclear Zone - Exhibit Hall Booth 123850 minsPipeline curtailments during extreme weather events have made on-site fuel back-up a reliability requirement, not just a contingency plan. For plant managers and directors of generation operating gas …
-
250F50 minsData center energy campus projects are moving forward before load certainty, commercial terms, and interconnection outcomes are fully resolved. Developers and their partners are committing capital for …Chairperson
-
251A50 minsMuch of the U.S. wind fleet is approaching or past the 20-year mark, and repowering economics increasingly depend on how much existing balance-of-plant infrastructure can be reused rather than replace …
11:15 AM
-
250D50 minsGas turbine order books are full into the next decade, interconnection queues are lengthening, and data center load growth is compressing the timeline between resource planning decisions and capacity …Chairperson
1:30 PM
-
250D50 minsEnhanced geothermal systems are moving from research programs to operating projects, and the timeline to commercial scale is compressing. This panel brings together subsurface technology developers, a …
-
250F50 minsGetting a power generation project from development decision to commercial operation has always been complex. In the current market, the variables are compounding: gas turbine lead times stretching to …
2:30 PM
-
250D50 minsGeothermal offers firm, carbon-free capacity. Getting there requires navigating a set of execution risks that early projects are now quantifying in practice. This session examines geothermal from the …
-
250B50 minsWhen an aging 25 MW CHP asset at an industrial facility in Ohio reached end of life, the customer needed more behind-the-meter capacity, not a construction project to manage. DTE Vantage is delivering …
-
Thermal & Nuclear Zone - Exhibit Hall Booth 123850 minsExecutive Order 14301 set a target for at least three advanced reactors to achieve criticality by July 4, 2026. Four met the deadline, with a fifth following shortly after, marking the most concentrat …Chairperson
10:15 AM
-
250A50 minsAs utility-scale BESS deployments accelerate, the gap between evolving fire codes and on-the-ground implementation remains a critical industry challenge. This session draws on submissions from the Fir …
-
250F50 minsPower generation and data center construction projects are increasingly competing for the same pool of electricians, pipefitters, welders, millwrights, and commissioning personnel, often in the same g …
11:15 AM
-
250A50 minsCommunity opposition is one of the most underestimated risks in utility-scale BESS development, with projects facing delays or cancellations not due to technical or regulatory failure, but due to erod …
-
From Regional Silos to Integrated Asset Management: How Petrobras Transformed a Thermoelectric FleetO&M and Reliability Zone - Exhibit Hall Booth 445550 minsManaging a portfolio of thermoelectric assets across multiple regions creates a familiar tension: local operating units develop strong execution capability but limited integration, and the inconsisten …
1:30 PM
-
250D50 minsPost-combustion carbon capture is increasingly relevant to utilities and IPPs managing emissions compliance on existing thermal assets, but the integration questions, energy demand, solvent performanc …
-
250C50 minsHyperscale data center load is arriving on timelines that conventional interconnection and transmission development cannot match. The structural mismatch between when capacity is needed and when it ca …
-
250F50 minsGas turbine lead times stretching to 2029 and beyond have forced a structural change in how thermal power projects are executed. Owners and developers are now procuring long-lead powertrain equipment …
2:30 PM
-
250F50 minsMost megaproject cost overruns and schedule failures originate not in construction but in front-end decisions made under incomplete information, scope that was not fully defined, delivery strategies t …
-
250B50 minsGigawatt-scale AI campuses need more than electricity. They need transmission access, cooling water, fuel infrastructure, industrial permitting capacity and operational resilience, and they need all o …Chairperson
-
Data Center & New Demand Zone - Exhibit Hall Booth 500450 minsHyperscale data centers need power on 12 to 24-month timelines. Interconnection queues run five years or longer. Meanwhile, oil and gas producers across North America are managing stranded gas, flarin …
9:30 AM
-
Data Center & New Demand Zone - Exhibit Hall Booth 500450 minsData centers require 99.999% reliability, roughly five minutes of downtime per year. Achieving that with a fleet of reciprocating gensets means procuring more units than the load requires, and knowing …
-
250B50 minsAdvanced reactor development, DOE-funded infrastructure projects and NRC-regulated work are expanding the universe of organizations encountering ASME NQA-1 requirements for the first time. For EPCs, c …Chairperson
-
Thermal & Nuclear Zone - Exhibit Hall Booth 123850 minsAdvanced nuclear is moving from concept to hardware. BWXT Advanced Technologies began production of the Project Pele transportable reactor in July 2025, delivered TRISO fuel to Idaho National Laborato …
-
250E50 minsRetired coal sites often come with something new generation sites do not: existing transmission interconnection, water systems, fuel infrastructure and balance-of-plant assets that can materially comp …
10:30 AM
-
O&M and Reliability Zone - Exhibit Hall Booth 445550 minsWhen a transformer fails or a critical component goes down, recovery time is increasingly determined by supply chain availability, long manufacturing queues, specialized logistics and coordination dep …
-
250E50 minsPermitting, financing and engineering are not sufficient to deliver a major generation project if stakeholder opposition can halt regulatory momentum or disrupt construction timelines. This session ex …
-
Thermal & Nuclear Zone - Exhibit Hall Booth 123850 minsA combined-cycle plant ordered today will operate in a grid that looks materially different by the time it reaches its mid-life maintenance window. Designing for that reality, rather than for current …
11:30 AM
-
250C50 minsAI data centers have more pressure on timelines than any industrial buildout in history. At the same time, gas turbine lead times are a half-decade long, new transmission seems untenable, and it is ha …Chairperson
-
250F50 minsCanada's provincial Call for Power processes, the primary mechanism through which utilities contract new renewable generation, operate differently from U.S. RFP and PPA structures in ways that meaning …Chairperson
Other Project Development & Delivery News
Blue Energy files first NRC application for Texas gas-to-nuclear project
Blue Energy has filed the first portion of its NRC construction permit application for a first-of-its-kind gas-to-nuclear power plant in Port of Victoria, Texas. The project would pair GE Vernova gas turbines with BWRX-300 small modular reactors in a phased approach designed to accelerate nuclear deployment.
September 24, 2026