Project development and delivery are under growing pressure as demand rises, timelines compress and execution risks multiply across the power sector. This topic covers how projects move from concept to commercial operation, including siting, permitting, contracting, procurement, engineering, sequencing, risk management and delivery strategy. The emphasis is on lessons that help developers, utilities, EPCs and suppliers execute better and bring capacity online successfully.

Project Development & Delivery Educational Opportunities 

Loading
1:00 PM
  1. 250B
    120 mins
    These courses are included for all-access badge holders. You can pre-register for your preferred course; however, seating is available on a first-come, first-served basis. COURSE DESCRIPTION:  Battery …
10:15 AM
  1. Exhibit Hall - Thermal & Nuclear Zone Booth #1238
    50 mins
    Pipeline curtailments during extreme weather events have made on-site fuel back-up a reliability requirement, not just a contingency plan. For plant managers and directors of generation operating gas …
  2. 250F
    50 mins
    Data center energy campus projects are moving forward before load certainty, commercial terms, and interconnection outcomes are fully resolved. Developers and their partners are committing capital for …
  3. 251A
    50 mins
    Much of the U.S. wind fleet is approaching or past the 20-year mark, and repowering economics increasingly depend on how much existing balance-of-plant infrastructure can be reused rather than replace …
  4. 251B
    50 mins
    Operational conflicts discovered during commissioning are expensive. The schedule pressure is real, the options are limited, and the design is already locked. Simulation-assisted engineering (SAE) add …
11:15 AM
  1. 250D
    50 mins
    Gas turbine order books are full into the next decade, interconnection queues are lengthening, and data center load growth is compressing the timeline between resource planning decisions and capacity …
  2. Exhibit Hall - Center Stage Booth #3535
    50 mins
    Natural gas generation is growing faster than at any point in recent memory, and the decisions made in the next few years will shape the power sector’s emissions profile for decades. Building plants t …
1:30 PM
  1. 250D
    50 mins
    Enhanced geothermal systems are moving from research programs to operating projects, and the timeline to commercial scale is compressing. This panel brings together subsurface technology developers, a …
  2. 250F
    50 mins
    Getting a power generation project from development decision to commercial operation has always been complex. In the current market, the variables are compounding: gas turbine lead times stretching to …
2:30 PM
  1. 250D
    50 mins
    Geothermal offers firm, carbon-free capacity. Getting there requires navigating a set of execution risks that early projects are now quantifying in practice.  This session examines geothermal from the …
  2. 250B
    50 mins
    When an aging 25 MW CHP asset at an industrial facility in Ohio reached end of life, the customer needed more behind-the-meter capacity, not a construction project to manage. DTE Vantage is delivering …
  3. Exhibit Hall - Thermal & Nuclear Zone Booth #1238
    50 mins
    Executive Order 14301 set a target for at least three advanced reactors to achieve criticality by July 4, 2026. Four met the deadline, with a fifth following shortly after, marking the most concentrat …
10:15 AM
  1. 250A
    50 mins
    As utility-scale BESS deployments accelerate, the gap between evolving fire codes and on-the-ground implementation remains a critical industry challenge. This session draws on submissions from the Fir …
  2. 250F
    50 mins
    Power generation and data center construction projects are increasingly competing for the same pool of electricians, pipefitters, welders, millwrights, and commissioning personnel, often in the same g …
10:30 AM
  1. 251D
    120 mins
    Pre-registration for this event is required and includes an additional fee. Visit your registration resource center or reach out to info@powergen.com.  Think You Know Generator Sizing?  What electrica …
11:15 AM
  1. 250A
    50 mins
    Community opposition is one of the most underestimated risks in utility-scale BESS development, with projects facing delays or cancellations not due to technical or regulatory failure, but due to erod …
  2. Exhibit Hall - O&M and Reliability Zone Booth #4455
    50 mins
    Managing a portfolio of thermoelectric assets across multiple regions creates a familiar tension: local operating units develop strong execution capability but limited integration, and the inconsisten …
  3. Exhibit Hall - Center Stage Booth #3535
    50 mins
    They didn't plan it this way. But a group of executives who once walked the same halls at PacifiCorp went on to lead across the full spectrum of the power industry, from federal power administration a …
  4. 250F
    50 mins
    New generation projects are being proposed and committed in a market constrained by long-lead equipment, limited skilled labor and a shortage of experienced project personnel. In this environment, sch …
1:30 PM
  1. 250D
    50 mins
    Post-combustion carbon capture is increasingly relevant to utilities and IPPs managing emissions compliance on existing thermal assets, but the integration questions, energy demand, solvent performanc …
  2. 250C
    50 mins
    Hyperscale data center load is arriving on timelines that conventional interconnection and transmission development cannot match. The structural mismatch between when capacity is needed and when it ca …
  3. 250F
    50 mins
    Gas turbine lead times stretching to 2029 and beyond have forced a structural change in how thermal power projects are executed. Owners and developers are now procuring long-lead powertrain equipment …
  4. 250B
    50 mins
    Gas turbine frame orders now carry delivery dates extending to 2029 and beyond. Large power transformer lead times have lengthened materially. EPC labor is being competed for across simultaneous power …
2:30 PM
  1. 250F
    50 mins
    Most megaproject cost overruns and schedule failures originate not in construction but in front-end decisions made under incomplete information, scope that was not fully defined, delivery strategies t …
  2. 250B
    50 mins
    Gigawatt-scale AI campuses need more than electricity. They need transmission access, cooling water, fuel infrastructure, industrial permitting capacity and operational resilience, and they need all o …
  3. Exhibit Hall - Data Center & New Demand Zone Booth #5004
    50 mins
    Hyperscale data centers need power on 12 to 24-month timelines. Interconnection queues run five years or longer. Meanwhile, oil and gas producers across North America are managing stranded gas, flarin …
9:30 AM
  1. Exhibit Hall - Data Center & New Demand Zone Booth #5004
    50 mins
    Data centers require 99.999% reliability, roughly five minutes of downtime per year. Achieving that with a fleet of reciprocating gensets means procuring more units than the load requires, and knowing …
  2. 250B
    50 mins
    Advanced reactor development, DOE-funded infrastructure projects and NRC-regulated work are expanding the universe of organizations encountering ASME NQA-1 requirements for the first time. For EPCs, c …
  3. Exhibit Hall - Thermal & Nuclear Zone Booth #1238
    50 mins
    Advanced nuclear is moving from concept to hardware. BWXT Advanced Technologies began production of the Project Pele transportable reactor in July 2025, delivered TRISO fuel to Idaho National Laborato …
  4. 250E
    50 mins
    Retired coal sites often come with something new generation sites do not: existing transmission interconnection, water systems, fuel infrastructure and balance-of-plant assets that can materially comp …
  5. 251A
    50 mins
    Natural gas combined-cycle plants are attractive candidates for carbon capture, but their exhaust presents specific challenges: low CO₂ concentration relative to coal and large flue-gas volumes that i …
10:30 AM
  1. Exhibit Hall - O&M and Reliability Zone Booth #4455
    50 mins
    When a transformer fails or a critical component goes down, recovery time is increasingly determined by supply chain availability, long manufacturing queues, specialized logistics and coordination dep …
  2. 250E
    50 mins
    Permitting, financing and engineering are not sufficient to deliver a major generation project if stakeholder opposition can halt regulatory momentum or disrupt construction timelines. This session ex …
  3. Exhibit Hall - Thermal & Nuclear Zone Booth #1238
    50 mins
    Designing flexible power plants for today and tomorrow presents both challenges and compelling opportunities as the energy sector and their customers continue to evolve.  Modern generating facilities …
11:30 AM
  1. 250C
    50 mins
    AI data centers have more pressure on timelines than any industrial buildout in history. At the same time, gas turbine lead times are a half-decade long, new transmission seems untenable, and it is ha …
  2. 250F
    50 mins
    Canada's provincial Call for Power processes, the primary mechanism through which utilities contract new renewable generation, operate differently from U.S. RFP and PPA structures in ways that meaning …

NRG Energy to sell 4.9 GW of gas generation back to LS Power in $4B portfolio shakeup

Less than a year after closing its LS Power acquisition, NRG is selling six gas plants back for $4 billion after what it called an unsolicited offer it couldn’t pass up.
November 09, 2026

PJM puts generator performance at the center of its cold-weather plans

Forecast winter demand has climbed 7,500 MW since 2022 and is now above PJM’s all-time peak, while new supply lags and reserve margins tighten.
November 09, 2026

People on the Move: Southern Company, Fluence Energy welcome new executive leaders

Leadership changes are reshaping the power industry as winter approaches, with Southern Company, Fluence Energy, GE Vernova and Caterpillar announcing executive appointments, transitions and retirements across utility generation, energy storage and manufacturing.
November 09, 2026

POWERGEN™ 2027 Announces Keynote Program Featuring Industry Leaders Addressing Grid Reliability, AI, and the Future of Power Generation

Utility, grid operator and security executives headline a keynote program focused on demand growth, grid readiness and operational resilience.
November 06, 2026