Project development and delivery are under growing pressure as demand rises, timelines compress and execution risks multiply across the power sector. This topic covers how projects move from concept to commercial operation, including siting, permitting, contracting, procurement, engineering, sequencing, risk management and delivery strategy. The emphasis is on lessons that help developers, utilities, EPCs and suppliers execute better and bring capacity online successfully.

Project Development & Delivery Educational Opportunities 

Loading
9:00 AM
  1. 250A
    180 mins
    These courses are included for all-access badge holders. You can pre-register for your preferred course; however, seating is available on a first-come, first-served basis. COURSE DESCRIPTION: Utilitie …
1:00 PM
  1. 250B
    120 mins
    These courses are included for all-access badge holders. You can pre-register for your preferred course; however, seating is available on a first-come, first-served basis. COURSE DESCRIPTION:  Battery …
10:15 AM
  1. Thermal & Nuclear Zone - Exhibit Hall Booth 1238
    50 mins
    Pipeline curtailments during extreme weather events have made on-site fuel back-up a reliability requirement, not just a contingency plan. For plant managers and directors of generation operating gas …
  2. 250F
    50 mins
    Data center energy campus projects are moving forward before load certainty, commercial terms, and interconnection outcomes are fully resolved. Developers and their partners are committing capital for …
  3. 251A
    50 mins
    Much of the U.S. wind fleet is approaching or past the 20-year mark, and repowering economics increasingly depend on how much existing balance-of-plant infrastructure can be reused rather than replace …
11:15 AM
  1. 250D
    50 mins
    Gas turbine order books are full into the next decade, interconnection queues are lengthening, and data center load growth is compressing the timeline between resource planning decisions and capacity …
1:30 PM
  1. 250D
    50 mins
    Enhanced geothermal systems are moving from research programs to operating projects, and the timeline to commercial scale is compressing. This panel brings together subsurface technology developers, a …
  2. 250F
    50 mins
    Getting a power generation project from development decision to commercial operation has always been complex. In the current market, the variables are compounding: gas turbine lead times stretching to …
2:30 PM
  1. 250D
    50 mins
    Geothermal offers firm, carbon-free capacity. Getting there requires navigating a set of execution risks that early projects are now quantifying in practice.  This session examines geothermal from the …
  2. 250B
    50 mins
    When an aging 25 MW CHP asset at an industrial facility in Ohio reached end of life, the customer needed more behind-the-meter capacity, not a construction project to manage. DTE Vantage is delivering …
  3. Thermal & Nuclear Zone - Exhibit Hall Booth 1238
    50 mins
    Executive Order 14301 set a target for at least three advanced reactors to achieve criticality by July 4, 2026. Four met the deadline, with a fifth following shortly after, marking the most concentrat …
10:15 AM
  1. 250A
    50 mins
    As utility-scale BESS deployments accelerate, the gap between evolving fire codes and on-the-ground implementation remains a critical industry challenge. This session draws on submissions from the Fir …
  2. 250F
    50 mins
    Power generation and data center construction projects are increasingly competing for the same pool of electricians, pipefitters, welders, millwrights, and commissioning personnel, often in the same g …
11:15 AM
  1. 250A
    50 mins
    Community opposition is one of the most underestimated risks in utility-scale BESS development, with projects facing delays or cancellations not due to technical or regulatory failure, but due to erod …
  2. O&M and Reliability Zone - Exhibit Hall Booth 4455
    50 mins
    Managing a portfolio of thermoelectric assets across multiple regions creates a familiar tension: local operating units develop strong execution capability but limited integration, and the inconsisten …
1:30 PM
  1. 250D
    50 mins
    Post-combustion carbon capture is increasingly relevant to utilities and IPPs managing emissions compliance on existing thermal assets, but the integration questions, energy demand, solvent performanc …
  2. 250C
    50 mins
    Hyperscale data center load is arriving on timelines that conventional interconnection and transmission development cannot match. The structural mismatch between when capacity is needed and when it ca …
  3. 250F
    50 mins
    Gas turbine lead times stretching to 2029 and beyond have forced a structural change in how thermal power projects are executed. Owners and developers are now procuring long-lead powertrain equipment …
2:30 PM
  1. 250F
    50 mins
    Most megaproject cost overruns and schedule failures originate not in construction but in front-end decisions made under incomplete information, scope that was not fully defined, delivery strategies t …
  2. 250B
    50 mins
    Gigawatt-scale AI campuses need more than electricity. They need transmission access, cooling water, fuel infrastructure, industrial permitting capacity and operational resilience, and they need all o …
  3. Data Center & New Demand Zone - Exhibit Hall Booth 5004
    50 mins
    Hyperscale data centers need power on 12 to 24-month timelines. Interconnection queues run five years or longer. Meanwhile, oil and gas producers across North America are managing stranded gas, flarin …
9:30 AM
  1. Data Center & New Demand Zone - Exhibit Hall Booth 5004
    50 mins
    Data centers require 99.999% reliability, roughly five minutes of downtime per year. Achieving that with a fleet of reciprocating gensets means procuring more units than the load requires, and knowing …
  2. 250B
    50 mins
    Advanced reactor development, DOE-funded infrastructure projects and NRC-regulated work are expanding the universe of organizations encountering ASME NQA-1 requirements for the first time. For EPCs, c …
  3. Thermal & Nuclear Zone - Exhibit Hall Booth 1238
    50 mins
    Advanced nuclear is moving from concept to hardware. BWXT Advanced Technologies began production of the Project Pele transportable reactor in July 2025, delivered TRISO fuel to Idaho National Laborato …
  4. 250E
    50 mins
    Retired coal sites often come with something new generation sites do not: existing transmission interconnection, water systems, fuel infrastructure and balance-of-plant assets that can materially comp …
10:30 AM
  1. O&M and Reliability Zone - Exhibit Hall Booth 4455
    50 mins
    When a transformer fails or a critical component goes down, recovery time is increasingly determined by supply chain availability, long manufacturing queues, specialized logistics and coordination dep …
  2. 250E
    50 mins
    Permitting, financing and engineering are not sufficient to deliver a major generation project if stakeholder opposition can halt regulatory momentum or disrupt construction timelines. This session ex …
  3. Thermal & Nuclear Zone - Exhibit Hall Booth 1238
    50 mins
    A combined-cycle plant ordered today will operate in a grid that looks materially different by the time it reaches its mid-life maintenance window. Designing for that reality, rather than for current …
11:30 AM
  1. 250C
    50 mins
    AI data centers have more pressure on timelines than any industrial buildout in history. At the same time, gas turbine lead times are a half-decade long, new transmission seems untenable, and it is ha …
  2. 250F
    50 mins
    Canada's provincial Call for Power processes, the primary mechanism through which utilities contract new renewable generation, operate differently from U.S. RFP and PPA structures in ways that meaning …

Blue Energy files first NRC application for Texas gas-to-nuclear project

Blue Energy has filed the first portion of its NRC construction permit application for a first-of-its-kind gas-to-nuclear power plant in Port of Victoria, Texas. The project would pair GE Vernova gas turbines with BWRX-300 small modular reactors in a phased approach designed to accelerate nuclear deployment.
September 24, 2026

Google to pay for nuclear uprates at Georgia Power’s Hatch, Vogtle plants

Georgia Power and Google agreed to uprate nuclear units at Plants Vogtle and Hatch, adding 96 MW capacity for Georgia Power customers, pending Georgia PSC approval.
September 22, 2026

POWERGEN 2027 conference agenda maps the industry’s response to record demand

Sessions across generation, operations, permitting and storage show how owners and suppliers are answering a load growth cycle that would have seemed unlikely five years ago.
September 22, 2026

OPG signs $1.7B contract for Pickering nuclear plant refurbishment

Candu Energy and Aecon Group signed a $1.7 billion contract with Ontario Power Generation for Unit 5 refurbishment at Pickering Nuclear Station, ensuring low-carbon electricity until the 2060s.
September 22, 2026