Steam cycle and HRSG performance remains critical as combined cycle plants operate more dynamically and aging equipment faces new thermal and mechanical stress. This topic addresses inspection, chemistry, failure prevention, maintenance strategy, bypass systems, outage planning and upgrade opportunities. For operators and engineers, good steam-side decisions directly affect reliability, output, heat rate, outage scope and the long-term health of major plant assets.

Steam Cycle & HRSG Educational Opportunities 

Loading
11:15 AM
  1. O&M and Reliability Zone - Exhibit Hall Booth 4455
    50 mins
    Steam boilers were designed for steady baseload operation. As grid conditions push thermal fleets toward more frequent starts, deeper turndowns and aggressive cycling, the operating envelope shifts we …
11:15 AM
  1. Thermal & Nuclear Zone - Exhibit Hall Booth 1238
    50 mins
    Grid operators are asking combined-cycle and simple-cycle gas turbines to turn down deeper and more frequently than their original designs anticipated. Emissions-compliant operation at lower loads is …
1:30 PM
  1. 250F
    50 mins
    Gas turbine lead times stretching to 2029 and beyond have forced a structural change in how thermal power projects are executed. Owners and developers are now procuring long-lead powertrain equipment …
2:30 PM
  1. 250D
    50 mins
    As power and industrial operators face increasing pressure to decarbonize, many carbon capture systems today are still difficult to deploy in practice due to operational complexity, energy penalties, …
10:30 AM
  1. Thermal & Nuclear Zone - Exhibit Hall Booth 1238
    50 mins
    A combined-cycle plant ordered today will operate in a grid that looks materially different by the time it reaches its mid-life maintenance window. Designing for that reality, rather than for current …
11:30 AM
  1. Thermal & Nuclear Zone - Exhibit Hall Booth 1238
    50 mins
    The U.S. has more than 134 GW of installed simple-cycle gas turbine capacity. Most of it was never paired with a steam bottoming cycle for straightforward reasons: high capital cost, large footprint, …
  2. O&M and Reliability Zone - Exhibit Hall Booth 4455
    50 mins
    Gas-side fouling deep within HRSG harp sections, including ferrous oxide scale, ammonium bisulfate deposits from SCR ammonia slip and insulation debris, accumulates on finned tube bundles where conven …

Other Steam Cycle & HRSG News

Visit Our Official Media Partner, Factor This Power Engineering, for more Steam Cycle & HRSG News

Army offers up underutilized military land to private developers for new power generation and storage

The U.S. Army selected three private developers, including Ameresco, Indelible-Bloom, and Frontier Power USA, to build power generation projects on military bases, enhancing energy resilience.
September 25, 2026

Is it the future yet? | Factor This Brief

As the reality of nuclear fusion approaches, Base Power attracts a billion bucks and launches a new battery, Eolian starts construction on PJM's biggest BESS, Avantus doubles its credit facility, Antares raises $470M for microreactors, and Sungrow commissions a critical solar-plus-storage project in Sierra Lione.
August 11, 2026

PJM accepts over 700 generation projects in new ‘first-ready, first-served’ queue

PJM Interconnection hasw announced 715 new generation projects, capable of over 200 gigawatts, qualified for study under a reformed interconnection process.
August 06, 2026

Federal government to turn a Kentucky uranium plant into an AI data center and gas power complex

The U.S. Department of Energy is partnering with Brookfield Asset Management to develop a $100 billion AI data center and power plant at the Paducah Gaseous Diffusion Plant in Kentucky.
August 04, 2026

 

VIEW FULL AGENDA

ATTEND

EXHIBIT/SPONSOR